ChinaCNC UK All articles
Sourcing & Procurement

The Handover Point: Why a Chinese CNC Quote Needs More Than Three Letters

ChinaCNC UK
The Handover Point: Why a Chinese CNC Quote Needs More Than Three Letters

A Chinese CNC quotation frequently arrives as a unit price, a lead time and a three-letter code. The code looks decisive. In practice, it is only half a term. Under Incoterms 2020, every rule needs a named place, and every named place needs enough detail to be enforceable. Without that, the handover point — the moment risk moves from supplier to buyer — is left to be settled somewhere between the purchase order and a forwarder’s email thread.

For UK buyers of machined parts, the gap matters. CNC components are often compact, high-value and sensitive to handling. A pallet that is damaged before loading, a container that is held at a Chinese terminal, or a delivery that arrives at the wrong UK address can turn a competitive quotation into a slow argument about who owned the goods at the relevant moment. Incoterms do not price the parts. They allocate tasks, costs and risk. Getting them right is a procurement discipline, not a technicality.

The code is only half the term

Incoterms 2020 remains the current edition. The rules are widely used, but they are also widely abbreviated. A quotation that says FOB without a port, or DAP without an address, is not a complete delivery term. It is a shorthand that may conceal disagreement.

The first distinction to hold on to is between cost and risk. A supplier can pay freight to a UK destination without carrying risk to that destination. That is the central feature of CIF, and it is the source of many misunderstandings. The second distinction is between the main carriage and the origin or destination charges that sit around it. Terminal handling, documentation, customs brokerage and delivery appointments are not automatically allocated by the three-letter code. They need to be named.

EXW: the shortest handover, the longest to-do list

EXW, or Ex Works, places the goods at the buyer’s disposal at the supplier’s premises. The seller’s obligation is short. The buyer bears the collection, loading, export clearance and main carriage. Risk passes when the goods are placed at the buyer’s disposal at the named place — not when they are loaded onto the buyer’s vehicle, unless the contract says otherwise.

For a UK buyer without a Chinese entity or a customs presence in China, EXW is rarely the comfortable choice. Export declaration in China is normally a matter for the supplier or its trading company, and a UK importer may not be in a position to perform it. Loading is another ambiguity: under EXW the seller is not obliged to load. If a heavy crate is damaged during loading, the allocation may depend on who agreed to handle it.

EXW can work where the buyer has a trusted Chinese forwarder and a supplier willing to load and assist with export paperwork. If it is used, the purchase order should name the full works address, state who loads, and confirm who prepares the export declaration and provides the export documents.

FOB: risk at the ship, not at the forwarder’s door

FOB, or Free On Board, is familiar from sea freight. The seller clears the goods for export and delivers them on board the vessel at the named port of shipment. Risk passes at that point. The buyer arranges and pays the main carriage and insurance.

The named port is essential. FOB Ningbo is more precise than FOB China, but it may still be insufficient if the parties disagree about the terminal, the container yard or the point at which the supplier’s responsibility ends. In containerised trade, goods are often handed to a forwarder or terminal before they are loaded on board. That can create a gap between the supplier’s delivery to the terminal and the FOB risk point. FCA, or Free Carrier, is often the cleaner rule for containers because it can name the place where the carrier takes control.

If FOB is retained, the purchase order should identify the port and terminal, allocate origin terminal handling and documentation charges, and require the supplier to give a dispatch notice with crate dimensions, weights and the vessel details. The bill of lading should show a port of loading consistent with the term.

CIF: freight and insurance, but not risk to the UK

CIF, or Cost, Insurance and Freight, is the term most likely to create a false sense of cover. The seller pays the cost and freight to the named destination port and arranges insurance. But risk still passes when the goods are on board at the port of shipment. CIF does not make the supplier responsible for the goods all the way to Felixstowe or Southampton.

The insurance obligation is also narrower than many buyers assume. CIF requires cover of at least 110 per cent of the contract value, complying with Institute Cargo Clauses (C) unless otherwise agreed. Clause C is a restricted cover. It is not an all-risks policy. For CNC parts with critical surfaces, tight tolerances or high replacement value, the buyer should consider requiring Clause A cover and confirming that the policy is assignable, that claims can be handled in the UK, and that the certificate or endorsement will be provided with the shipping documents.

CIF also stops at the destination port. Discharge, port charges, onward haulage, import clearance and UK delivery are outside the term unless separately agreed. The buyer should check who pays destination terminal handling and whether the supplier’s freight quote includes the charges that the UK forwarder will later invoice. A CIF quote can look complete while leaving the pallet exposed at the Chinese dock, under-insured in transit, and uncollected at the UK port.

DAP: the longest seller obligation, with a customs sting

DAP, or Delivered at Place, requires the seller to deliver the goods to the named place, ready for unloading. The seller bears the risk to that point. The buyer handles import clearance and pays any duty, VAT and import charges. DAP is often attractive to UK buyers because it appears to offer a door-to-door service. The appearance can be misleading if the named place is vague.

DAP UK is not a delivery term. DAP to a full UK address, with a delivery window and unloading arrangements, is. The buyer should confirm whether the seller’s carrier will use a tail-lift, whether the site has a loading bay, and who is responsible for unloading. Under DAP, the buyer is generally responsible for unloading unless the contract states otherwise. Import VAT and duty remain the buyer’s responsibility, and the buyer must be in a position to act as importer of record with a UK EORI number.

The named place is where disputes live

The recurring weakness in Chinese CNC contracts is not the choice of rule. It is the missing named place. FOB should name the port and, where possible, the terminal. CIF should name the destination port and clarify who bears destination charges. DAP should name the full delivery address and the delivery conditions. EXW should name the works and state who loads.

A useful test is to ask whether a forwarder could invoice the job without asking a further question. If the answer is no, the term is not yet complete. Origin charges such as terminal handling, container freight station costs, documentation, VGM submission and customs examination should be allocated in the purchase order, not discovered after the goods have left.

Clauses to write into the purchase order

A short set of clauses can remove most of the ambiguity:

  1. State the rule, the version and the named place in full: Incoterms 2020, followed by the precise port, terminal, works address or UK delivery address.
  2. Confirm export clearance responsibility and the documents the supplier will provide: commercial invoice, packing list, export declaration copy, certificate of origin where required, and the transport document.
  3. Allocate origin charges expressly, including terminal handling, documentation, container freight station costs, VGM and any customs examination costs.
  4. For CIF, specify the insurance clause, the insured value, the currency, the claims location and the documents that must be endorsed to the buyer.
  5. Require a dispatch notice with crate dimensions, gross weights, seal numbers and vessel or flight details.
  6. Add a consistency clause: the term and named place on the quotation, purchase order, invoice and bill of lading or air waybill must match. Any change requires a written amendment before shipment.
  7. State who is importer of record, who pays UK duty and VAT, and whether unloading at the UK address is included.

Reconcile before you pay

The final check belongs before the balance payment, not after the container has arrived. Compare the supplier’s invoice with the purchase order. Check the bill of lading or air waybill for the port of loading, port of discharge and freight terms. Ask the forwarder for a full cost breakdown. If the three documents do not align, stop and correct them in writing.

Incoterms are not a substitute for a delivery schedule, a packing specification or a quality clause. They are the handover mechanism that sits alongside them. On Chinese CNC orders, the three-letter code is the beginning of the conversation. The named place, the insurance and the charge allocation are where the risk actually changes hands.

All Articles

Related Articles

Second in the Queue: Holding Machine Time in a Chinese CNC Shop

Second in the Queue: Holding Machine Time in a Chinese CNC Shop

Revision Control at Arm’s Length: A Protocol for Engineering Changes on Chinese CNC Contracts

Revision Control at Arm’s Length: A Protocol for Engineering Changes on Chinese CNC Contracts

The Last Process Is the Journey: Specifying Packaging for Chinese CNC Parts

The Last Process Is the Journey: Specifying Packaging for Chinese CNC Parts